Circular & Policies - Ministry of Power
Ministry of Power
Date | Description | Download |
|---|---|---|
14/05/2024 | Clarification to Revised Policy for Biomass Utilization for Power Generation through Co-firing in Coal based Power Plants issued on O8.1O.2O21 | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Clarification-to-Revised-Policy-for-Biomass-Utilization-for-Power-Generation-through-Co-firing-in-Coal-based-Power-Plants-issued-on-O8.1O.2O21.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
24/04/2024 | Clarification regarding Guidelines for operationalizing optimum utilization of generating stations as per the requirement in the Electricity Grid | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Clarification-regarding-Guidelines-for-operationalizing-optimum-utilization-of-generating-stations-as-per-the-requirement-in-the-Electricity-Grid.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
12/04/2024 | Directions to Gas Based Generating Stations (GBSs) under Section 11 of the Electricity Act, 2003 | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Directions-to-Gas-Based-Generating-Stations-GBSs-under-Section-11-of-the-Electricity-Act-2003.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
02/04/2024 | Constituition of an Independent Thermal Project Monitoring Group (TPMG) for monitoring the execution of Thermal Power Projects, under implementation. | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Constituition-of-an-Independent-Thermal-Project-Monitoring-Group-TPMG-for-monitoring-the-execution-of-Thermal-Power-Projects-under-implementation.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
01/04/2024 | The Electricity (Late Payment Surcharge and Related Matters) (Amendment) Rules, 2024. | <a href="http://ccai.co.in/wp-content/uploads/2026/02/The-Electricity-Late-Payment-Surcharge-and-Related-Matters-Amendment-Rules-2024.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
15/03/2024 | Methodology for allocation of coal as per provisions of Para B(viii)(a) of SHAKTI Policy of Ministry of Coal | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Methodology-for-allocation-of-coal-as-per-provisions-of-Para-Bviiia-of-SHAKTI-Policy-of-Ministry-of-Coal.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
15/03/2024 | Guidelines for coal or lignite based Power Plants (TPPs) to utilize ash by providing it to the 'user agencies' as stipulated in the MOEF&CC notification dated 31.12.2021 and its subsequent amendments | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Guidelines-for-fair-distribution-of-available-domestic-coal.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
04/03/2024 | Advisory to all GENCOs including Independent Power Producers (IPPs) for timely Import of Coal for blending purposes and maximizing production in captive coal mines - 2024 | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Advisory-to-all-GENCOs-including-Independent-Power-Producers-IPPs-for-timely-Import-of-Coal-for-blending-purposes-and-maximizing-production-in-captive-coal-mines.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
29/02/2024 | Report of the Committee constituted by MOP to examine different modes of Cntracting and restructure relevant provisions of contract in Hydro Power Sector | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Report-of-the-Committee-constituted-by-MOP-to-examine-different-modes-of-Cntracting-and-restructure-relevant-provisions-of-contract-in-Hydro-Power-Sector.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
23/02/2024 | the Electricity (Rights of Consumers) Amendment Rules, 2024 | <a href="http://ccai.co.in/wp-content/uploads/2026/02/the-Electricity-Rights-of-Consumers-Amendment-Rules-2024.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
26/10/2023 | Notification regarding Renewable Energy Purchase Obligation | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Notification-regarding-Renewable-Energy-Purchase-Obligation.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
25/10/2023 | Implementation of Uniform Renewable Energy Tariff. | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Implementation-ofUniform-Renewable-Energy-Tariff.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
25/10/2023 | Direction to all GENCOs including Independent Power Producers (IPPs) for timely Import of Coal for blending purposes and maximizing production in captive coal mines - 2023 | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Direction-to-all-GENCOs-including-Independent-Power-Producers-IPPs-for-timely-Import-of-Coal-for-blending-purposes-and-maximizing-production-in-captive-coal-mines-2023.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
25/10/2023 | Direction to all GENCOs including Independent Power Producers (IPPs) for timely Import of Coal for blending purposes and maximizing production in captive coal mines -2024 | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Direction-to-all-GENCOs-including-Independent-Power-Producers-IPPs-for-timely-Import-of-Coal-for-blending-purposes-and-maximizing-production-in-captive-coal-mines-2024.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
01/09/2023 | Growth of electricity sector in India from 1947-2023 | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Growth-of-electricity-sector-in-India-from-1947-2023.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
08/08/2023 | Amendment in the SBDs for procurement of lnter-State Transmission Services through Tariff Based Competitive Bidding (TBCB) process (Technical Qualification Requirement w.r.t. HVDC system) | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Amendment-in-the-SBDs-for-procurement-of-lnter-State-Transmission-Services-through-Tariff-Based-Competitive-Bidding-TBCB-process-Technical-Qualification-Requirement-w.r.t.-HVDC-system.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
26/07/2023 | the Electricity (Amendment) Rules, 2023 & the Electricity (Second Amendment) Rules, 2023 | <a href="http://ccai.co.in/wp-content/uploads/2026/02/the-Electricity-Amendment-Rules-2023-the-Electricity-Second-Amendment-Rules-2023.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
09/06/2023 | Delegation of power for approval under provision of Section 68 and Section 164 of the Electricity Act, 2003 | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Delegation-of-power-for-approval-under-provision-of-Section-68-and-Section-164-of-the-Electricity-Act-2003.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
09/06/2023 | Waiver of Inter-State Transmission Charges on transmission of the electricity generated from solar and wind sources of energy under Para 6.4 (6) of the Tariff Policy, 201ffi' Addendum- | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Waiver-of-Inter-State-Transmission-Charges-on-transmission-of-the-electricity-generated-from-solar-and-wind-sources-of-energy-under-Para-6.4-6-of-the-Tariff-Policy-201ffi_-Addendum-.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
17/5/2023 | Bidding document for Procurement of Agrgegate Power requirement of Group of States for undertaking tariff based competitive bidding for medium term procurement of Power under para B(V) of Shakti Policy | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Amendment-in-the-SBDs-for-procurement-of-lnter-State-Transmission-Services-through-Tariff-Based-Competitive-Bidding-TBCB-process-Technical-Qualification-Requirement-w.r.t.-HVDC-system.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
20/04/2023 | Scheme for Pooling of Tariff of those plants whose PPAs have expired | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Scheme-for-Pooling-of-Tariff-of-those-plants-whose-PPAs-have-expired.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
10/04/2023 | Guidelines to promote development of Pump Storage Projects (PSP) | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Guidelines-to-promote-development-of-Pump-Storage-Projects-PSP.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
24/03/2023 | Guidelines for fair distribution of available domestic coal | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Guidelines-for-fair-distribution-of-available-domestic-coal.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
28/02/2023 | Guidelines for supply of Fly-Ass to the end users by the Power Plants to increase fly ash utilization 2023 | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Guidelines-for-supply-of-Fly-Ass-to-the-end-users-by-the-Power-Plants-to-increase-fly-ash-utilization-2023.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
27/02/2023 | Resolution regarding Renewable Generation Obligation as per Revised Tariff Policy, 2016 | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Resolution-regarding-Renewable-Generation-Obligation-as-per-Revised-Tariff-Policy-2016.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
30/01/2023 | Electricity (Promoting Renewable Energy Through Green Energy Open Access) Amendment Rules, 2023. | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Electricity-Promoting-Renewable-Energy-Through-Green-Energy-Open-Access-Amendment-Rules-2023.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
04/01/2023 | Electricity (Amendment) Rules, 2022 | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Electricity-Amendment-Rules-2022.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
29/12/2022 | Energy Conservation (Amendment) Act, 2022 | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Energy-Conservation-Amendment-Act-2022.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
06/12/2022 | Guidelines for supply of Fly-Ass to the end users by the Power Plants to increase fly ash utilization 2022 | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Guidelines-for-supply-of-Fly-Ass-to-the-end-users-by-the-Power-Plants-to-increase-fly-ash-utilization-2022.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
15/11/2022 | Concept Note on Pooling of Tariff of 25 years Plus Thermal Gas Generating Stations. | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Concept-Note-on-Pooling-of-Tariff-of-25-years-Plus-Thermal-Gas-Generating-Stations.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
20/10/2022 | Guidelines under Section 63 of the Electricity Act, 2003 for procurement of power on Finance, Own and Operate (FOO) basis under para B(v) of the SHAKTI Policy | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Guidelines-under-Section-63-of-the-Electricity-Act-2003-for-procurement-of-power-on-Finance-Own-and-Operate-FOO-basis-under-para-Bv-of-the-SHAKTI-Policy.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
08/09/2022 | Distribution of Electricity Licence (Additional Requirements of Capital Adequacy, Creditworthiness and Code of Conduct) (Amendment) Rules, 2022 | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Distribution-of-Electricity-Licence-Additional-Requirements-of-Capital-Adequacy-Creditworthiness-and-Code-of-Conduct-Amendment-Rules-2022.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
08/09/2022 | Forum of Regulators (Amendment) Rules, 2022. | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Forum-of-Regulators-Amendment-Rules-2022.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
29/08/2022 | Amendments to the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Round-The Clock Power from Grid Connected Renewable Energy Power Projects | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Amendments-to-the-Guidelines-for-Tariff-Based-Competitive-Bidding-Process-for-Procurement-of-Round-The-Clock-Power-from-Grid-Connected-Renewable-Energy-Power-Projects.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
26/05/2022 | Trajectory for replacement of Thermal Energy with about 58,000 MU (30,000 MW) of Renewable Energy by 2025-26 | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Trajectory-for-replacement-of-Thermal-Energy-with-about-58000-MU-30000-MW-of-Renewable-Energy-by-2025-26.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
26/05/2022 | Direction under Section 11 to the Generating Companies having Domestic Coal Based Plants Supplying Electricity under Section 63 of the Electricity Act, 2003 | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Direction-under-Section-11-to-the-Generating-Companies-having-Domestic-Coal-Based-Plants-Supplying-Electricity-under-Section-63-of-the-Electricity-Act-2003.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
20/04/2022 | Electricity (Rights of Consumers) Amendment Rules, 2022 | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Electricity-Rights-of-Consumers-Amendment-Rules-2022.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
07/04/2022 | Revised Policy for Biomass Utilisation for Power Generation through Co-firing in Coal based Power Plants | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Revised-Policy-for-Biomass-Utilisation-for-Power-Generation-through-Co-firing-in-Coal-based-Power-Plants.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
06/04/2022 | Methodology for allocation of coal as per para B(VIIIA) covering B(III) of SHAKTI Policy as per HLEC recommendation | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Methodology-for-allocation-of-coal-as-per-para-BVIIIA-covering-BIII-of-SHAKTI-Policy-as-per-HLEC-recommendation.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
02/04/2022 | Model Long term contract for Biomass supply | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Model-Long-term-contract-for-Biomass-supply.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
11/03/2022 | Guidelines for Procurement and Utilization of Battery Energy Storage Systems as part of Generation, Transmission and Distribution assets, along with Ancillary Services | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Guidelines-for-Procurement-and-Utilization-of-Battery-Energy-Storage-Systems-as-part-of-Generation-Transmission-and-Distribution-assets-along-with-Ancillary-Services.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
09/03/2022 | Guidelines on Planning of Communication System for Inter-State Transmission System | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Guidelines-on-Planning-of-Communication-System-for-Inter-State-Transmission-System.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |
08/03/2022 | Setting up Power Foundation | <a href="http://ccai.co.in/wp-content/uploads/2026/02/Setting-up-Power-Foundation.pdf" class="pdf-download-btn" target="_blank" download><i class="fa fa-file-pdf pdf-icon"></i><span class="pdf-text">Download</span></a> |